PetIQ
This three-story structure currently under construction features rooftop decks, a cafeteria, an onsite gym and outdoor plazas. Rendering provided by Cole Architects.
Ronald McDonald House
To replace the original Boise Ronald McDonald House, this new two-story building has the ability to house 47 families. Amenities that accompany the increased living space include a private welcome room, four kitchens, family rooms, dining rooms, and a playroom/game room to be used by residents.
Lactalis
This project consisted of the design and structural engineering service of an existing manufacturing facility including a string cheese plant expansion, a wastewater treatment plant expansion, a whey plant expansion and a cheese pretreatment addition. Included in Axiom’s scope was designing a temporary pad for the construction of the new dryer chamber, design of the […]
The Broadway
This central plaza mixed use project in Idaho Falls consists of a below grade parking garage, with two buildings supported on top the post-tensioned slab. One of the buildings is 3-story steel framed building that will house retail, restaurants and office space. The second building is a 1 story wood frame building that will house […]
Micron Office Building (B37)
This project was delivered using Axiom’s Integrated Steel Delivery (ISD). ISD was chosen due to an extremely aggressive schedule combined with cost predictability in this competitive market. With ISD, Axiom started design just after Thanksgiving in 2017 and had the first phase of steel released for detailing and fabrication before the end of December 2017. […]
The Afton
The Afton was a two phase project developed to provide live-work housing and parking in downtown Boise. This six story housing project utilized a concrete shear wall podium and wood framing (4 over 2). Two levels of parking, live/work units and retail combined into first two levels. Being an early to market mid-rise condo project […]
One Nineteen Condos
This six-story housing project utilized a concrete shear wall podium and wood framing (4 over 2). Two levels of parking are included on the first two floors. This small size was maximized with the building footprint and included coordination with an underground storm drain that undercut the building footprint. Part of the building was cantilevered […]
St. Luke’s Emergency Room and MOB
This four-story project included a new emergency room and medical office building. This was the first building built by a private developer for St. Luke’s and was later purchased and then expanded onto with a complete hospital phase four years later. It incorporated a radial building architectural geometry, a new standard clinic design married with […]
St. Luke’s Hospital and MOB
This new greenfield site consisted of a three-story new hospital facility. This included a new central plant and all support facilities of a hospital including vibration sensitive Operating Rooms on elevated floors, quiet rooms with sound attenuation considerations and rooftop/secondary solutions for isolation of MEP and medical systems. Axiom helped expedite the schedule with the […]
The Fowler
This seven-story housing project utilizing a concrete shear wall podium and wood framing (5 over 2). Two levels of parking, 159 live-work units and retail will be combined into the first two levels of post tension concrete. This early to market mid-rise apartment project with an integrated parking podium was a challenge. Early concrete packages […]